No. | Clients | Projects | Date of Completion | Contract Summary (RM) |
1 | GOODWAY RUBBER INDUSTRIES SDN BHD | Electrical installation of FASA II for Factory 1A & Factory 3A | Jul 2000 | 1,128,000 |
2 | KINSTEEL BERHAD | Supply & install 3.3KV 1,000HP motor in Mill E | Dec 2000 | 170,000 |
3 | NAITO ELECTRONIC SDN BHD | Supply & install lighting & power for New Extension | Mar 2001 | 220,000 |
4 | KINSTEEL BERHAD | Supply & install 11/6.6KV 4MVA transformer and 1 No 1,500HP 6.6KV motor in Mill C | Dec 2001 | 440,000 |
5 | PT TECHOPIA INDONESIA | DI System & WWTP + Civil Electrical & Mechanical work | Sep 2002 | USD $ 95,000 |
6 | EBARA ENVIRONMENTAL ENGINEERING (M) SDN BHD (Pertima (Vietnam) Co. Ltd) | Cooling & DI water, WWTP, Supply & install mechanical panel | Apr 2003 | 753,000 |
7 | KINSTEEL BERHAD | Supply & install Mill B upgrade 11KV 131A power supply and plant motor wiring | Jun 2003 | 600,000 |
8 | KIN KEE HARDWARE SDN BHD | Supply & install new factory electrical incoming cable, switchboard and plant motor wiring | Apr 2004 | 380,000 |
9 | ROMPIN BEACH RESORT | Supply & install chalet electrical work included design, panel, cabling, wiring etc. | Jan 2005 | 600,000 |
10 | KINSTEEL BERHAD | Supply & install additional temporary Overhead line from Mill H to new wire rod Mill Second Power Supply | Jul 2005 | 35,695 |
11 | K. K. METAL PROCESSING SDN BHD | Supply & install lighting & power for New Extension | Dec 2005 | 520,000 |
12 | KINSTEEL BERHAD | Wire Rod Mill 132KV Intake Substation and Factory Power Supply | Jan 2007 | 17,872,970 |
13 | KINSTEEL BERHAD | Wire Rod Mill Water Filtering System 1,600M3/H | Jan 2007 | 6,000,000 |
14 | PERWAJA STEEL SDN BHD | Supply & install Weight Machine Communication Cable from Weight machine 1, 2 and 3 to control center and from center to monitor | 30 May 2007 | 26,710.00 |
15 | PERWAJA STEEL SDN BHD | To install Fiber Optical cable for WTP Contast (PLC Upgrading work) | 16 Jul 2007 | 11,000 |
16 | KIN KEE HARDWARE SDN BHD | Supply & install Sub-main cable, Sub D/B (Wire Rod Pull Machine) and sub-cable from D/B to Machine Control Panel | Aug 2007 | 33,000 |
17 | KINSTEEL BERHAD | Supply & install 11KV temporary Power Supply Cable from Mill A Substation to 132KV Substation for NT Mill Temporary Operation | Aug 2007 | 130,000 |
18 | S.J.K. (C) KG. BARU AMPANG | Supply & install power and lightning cable, fitting and TNB application of power supply | Aug 2008 | 333,000 |
19 | PCS VISON SDN BHD | Supply and install power main cable, generator, cable ducting and telephone manhole and ducting for Toll Plaza B at Kuala Lumpur – Putrajaya Highway | Dec 2007 | 1,063,000 |
20 | PERWAJA STEEL SDN BHD | Supply & replace 2 numbers of 15MVA on Load Tapchange Transformer for Electric Fur Case | Aug 2008 | 4,107,051.10 |
21 | PERFECT WIREMAKER SDN BHD | Supply and install Wiredrawing Machines Main Power Cable and Control Panel | Mar 2008 | 650,000 |
22 | PERFECT WIREMAKER SDN BHD | Supply and install Galvanizing Plan sub Switch Board Motor Control Panel, Power Cable and Control Panel | May 2008 | 688,274.47 |
23 | GOODWAY RUBBER IND. SDN BHD | Supply and install 415V Power Supply for New Rubber Machine at Factory A | Aug 2008 | 127,250 |
24 | KINSTEEL BERHAD | Calibrate, Cleaning and Testing Mill A to Mill H HV Switchgear, Capacitor, HV Motor Starter and LV MSB, SSB and Motor Starter | Oct 2008 | 360,000 |
25 | KINSTEEL BERHAD | Supply & Install Warehouse Extension Lighting and Power Switch Socket Outlet | Jan 2009 | 121,081.70 |
26 | KINSTEEL BERHAD | Supply and install 7MVA 11KV/2.8KV/2.8KV Thyristor Transformer For Wire Rod Factory, Early Capacitor 6.4MVA 2x3.2MVA 11KV/1.35KV Transformer | Aug 2009 | 300,603.25 |
27 | KIN KEE HARDWARE (KLANG) SDN BHD | The Design, Engineering, Procurement, Installation, Testing Commissioning And Maintenance Of New Factory At Lot No. 743 & 6723 | May 2009 | 980,000 |
28 | PERWAJA STEEL SDN BHD | Services OLTC (On Load Tap Changer) | Jun 2009 | 94,396.60 |
29 | KIN KEE HARDWARE (KLANG) SDN BHD | Supply & Install 11KV/433KV Transformer Testing & Commissioning | Jun 2009 | 179,854.74 |
29 | KIN KEE HARDWARE (KLANG) SDN BHD | Supply & Install Sub-Switch Board, Sub-Main Cable, Cable Ladder & Outgoing Cable To Motor | Jul 2009 | 140,386.76 |
30 | KINSTEEL BERHAD | Supply, Install & Modify 1.35KV VCB To 2.8KV VCB & Cable For Transformer 6300KVA Change To 7000KVA | Aug 2009 | 370,000 |
31 | KINSTEEL BERHAD | Supply & Install 11KV Power Cable From 132KV Sub-Station To Warehouse Extension 11KV VCB Panel, LV MSB-415V, Lighting & Power Point | Oct 2009 | 780,000 |
32 | KINSTEEL BERHAD | Supply & Install 11KV Power Cable From 132KV Sub-Station To Mill E&F Sub-Station | Oct 2009 | 380,000 |
33 | TIENFORCE ENGINEERING (MALAYSIA) SDN BHD | Design, Supply And Installation Of CVM15Kt/a Magnesium Smelter Plant Electrical System Project | Mar 2010 | 4,065,000 |
34 | PERWAJA STEEL SDN BHD | To Lay Cable 150mm2 And 120mm2 For New Service Air c/w Test Termination and Commissioning | Nov 2009 | 53,000 |
35 | PERWAJA STEEL SDN BHD | Provide manpower, equipment, tools & materials for inspect, service & test the on load tap changer OLTC for Chang Chun Sanding Transformer use at LMF 2 & LMF 3 | Mar 2010 | 45,675 |
36 | BEIJING TIEFORCE ENGINEERING CO. LTD | Supply & Install 2 Unit 2,000 KVAR Capacitor Bank for 400W 11KV Motor | Mar 2010 | 70,850 |
37 | TIEFORCE ENGINEERING (MALAYSIA) SDN BHD | Supply cable, and Install or supply manpower only to Install sub-main cables | In Progress | 374,245 |
38 | KIN KEE HARDWARE SDN BHD | Supply & Install Pipe Forming Machine Electrical Sub Switch Board Sub-main, Cable Wiring, & Control Cable | Apr 2010 | 168,709 |
39 | PEMBINAAN GENERASI (M) SDN BHD | Supply & Install 16 Units Wall Mounding Ventilation Fan at Block 19 | In Progress | 60,000 |